JOHANNESBURG (miningweekly.com) – All desktop work for the prefeasibility study at Aim-listed Katoro Gold’s Imweru mine has been completed.
Engineering and pit optimisation studies are also at an advanced stage, while all drilling required for the geohydrology study as part of the ongoing environmental- and social-impact assessment has been completed.
Katoro on Thursday also reported that, following a recent drill programme, metallurgical and resource batch samples had been dispatched to laboratories in South Africa and Tanzania.
A batch of geotechnical samples will also be exported to South Africa by early September.
Edited by: Creamer Media Reporter
EMAIL THIS ARTICLE SAVE THIS ARTICLE
ARTICLE ENQUIRY
To subscribe email subscriptions@creamermedia.co.za or click here
To advertise email advertising@creamermedia.co.za or click here